| Company: CONDEA AUGUSTA S.p.A. |
Petrochemical Industry |
Polyolefines Plant |
"Turnkey" Contract |
Lit. 700.000.000 |
In course |
| Company: RAYTHEON ITALIA S.r.l. (MI) |
Engineering Company |
Methaxylene Plant |
Detail Engineering |
Hours 10.000 |
1998 |
| Company: RAYTHEON ITALIA S.r.l. (MI) |
Engineering Company |
Paraxylene Plant |
Detail Engineering |
Hours 25.000 |
1997-98 |
| Company: JORDAN PETROLEUM REFINERY L.TD |
Petrochemical industry |
Purification and hydrogenation Lpg, Plant on skid |
"Turnkey" Contract |
Lit. 1.200.000.000 |
1996-1997 |
| Company: FIAT AVIO PER L'ENERGIA S.p.A. |
Engineering Company |
Plant of combined cycle cogeneration 150MW |
Instrumental Detail Engineering |
Hours 4.000 |
1996-1997 |
| Company: OXON ITALIANA S.p.A (MI) |
Pharmaceutics Industry |
Mesile Plant |
Detail Engineering |
Hours 4.000 |
1996 |
| Company: TECHINT S.p.A Milano |
Engineering company |
Natural gas turboexpander |
Detail Engineering |
Hours 5.000 |
1995 |
| Company: BADGER ITALIANA S.p.A Milano |
Engineering company |
Acetonitrile Plant |
Detail Engineering |
Hours 4.000 |
1994 |
| Company: ENICHEM ANIC S.p.A (MI) |
Petrochemical Industry |
Cumene Plant |
Process Study |
Hours 2.000 |
1994 |
| Company: ENICHEM S.p.A Milano |
Petrochemical Industry |
Acrylonitrile Plant |
Verification of Acrylonitrile production feasibility increment |
Hours 1.000 |
1993 |
| Company: TECHINT S.p.A Milano |
Engineering Company |
Hydroisomerization Cut Plant C4 |
Detail Engineering |
Hours 5.000 |
1992-1993 |
| Company: PRAOIL S.p.A Assago (MI) |
Petrochemical Industry |
BTX Plant |
Study of the process about a new productive arrangement valutation for the reformed gasoline fractionation |
Hours 1.500 |
1992-1993 |
| Company: PRAOIL S.p.A Assago (Mi) |
Petrochemical Industry |
Propane/Propylene Splitter Plant |
Feasibility Study for "Plymer Grade" capacity and production increase |
Hours 1.500 |
1992-1993 |
| Company: TECHINT S.p.A Milano |
Engineering company |
Natural gas turboexpander |
Detail Engineering |
Hours 2.500 |
1992-1993 |
| Company: PRAOIL S.p.A Assago (MI) |
Petrochemical Industry |
Revamping fractionation Plant BTX |
Base Engineering |
Hours 1.500 |
1992 |
| Company: PRAOIL S.p.A Assago (MI) |
Petrochemical Industry |
Xylenes separation Plant |
Process study for the column splitter PX/OX revamping |
Hours 1.500 |
1992 |
| Company: PRAOIL S.p.A Milano |
Petrochemical Industry |
Propane/Propylene Splitter Plant |
Process study for the Pseudocumene separation |
Hours 1.500 |
1992 |
| Company: ENICHEM ANIC S.p.A Milano |
Petrochemical Industry |
Ethylene Plant Revamping |
"Turnkey" Contract |
Lit. 1.000.000.000 |
1991-1992 |
| Company: TECHINT S.p.A Milano |
Enginering Company |
Charge Hydroisomerization C4 Plant |
Detail Engineering |
Hours 6.000 |
1991-1992 |
| Company: ENICHEM ANIC S.p.A Milano |
Petrochemical Industry |
Ethylenical drain recycle Plant |
Detail Engineering |
Hours 15.000 |
1990-1992 |
| Company: SAMATEC S.p.A Milano |
Petrochemical Industry |
Potassium pickle purification Plant |
"Turnkey" Contract |
Lit. 600.000.000 |
1990-1991 |
| Company: ENICHEM ANIC S.p.A Milano |
Petrochemical Industry |
Ethane/Ethylene splitter Plant |
Detail Engineering |
Hours 4.000 |
1990-1991 |
| Company: SAMATEC S.p.A Milano |
Chemical Industry |
Magnesium Solphate Plant |
Base and detail Engineering |
Hours 1.000 |
1990 |
| Company: ENICHEM ANIC S.p.A Milano |
Petrochemical Industry |
Xylene Plant |
Base Engineering |
Hours 1.000 |
1990 |
| Company: ENICHEM ANIC S.p.A Milano |
Petrochemical Industry |
BTX Plant |
Calculations of process and machanical |
Hours 1.000 |
1989 |
| Company: SAMATEC S.p.A |
Saltern of Volterra Factory (PI) |
Potassium Pickle Dechlorination Plant |
"Turnkey" Contract |
Lit. 350.000.000 |
1989-90 |
| Company: SAMATEC S.p.A |
Saltern of Volterra Factory (PI) |
Crystalline Potassium Chloride Stocking and Handling |
"Turnkey" Contract |
Lit. 600.000.000 |
1989-90 |
| Company: SAMATEC S.p.A |
Saltern of Volterra Factory (PI) |
Potassium Pickle Saturation Plant |
"Turnkey" Contract |
Lit. 400.000.000 |
1989-90 |
| Company: ENICHEM AUGUSTA S.p.A. Milano |
Sarroch Factory(CA) |
Fractionation of n-Paraffins Plant; "Air Coolers" insertion for condensation vapor line increment |
"Turnkey" Contract |
Lit. 800.000.000 |
1989-90 |
| Company: ENICHEM AUGUSTA S.p.A. Milano |
Factory of Sarroch (CA) |
Stocking Revamping GPL |
"Turnkey" Contract |
Lit. 1.800.000.000 |
1989-90 |
| Company: ENICHEM ANIC S.p.A. Milano |
Factory of Gela (CA) |
Plant of Hydrosomerization Cut C4 d interconnection with general factory services |
"Turnkey" Contract |
Lit. 4.500.000.000 |
1987-89 |
| Company: ENICHEM ANIC S.p.A Milano |
Petrochemical Industry |
Interconnecting Splitter Propane/Propylene Plant and general factory services |
"Turnkey" Contract |
Lit. 300.000.000 |
1985-1987 |
| Company: ENICHEM ANIC S.p.A Milano |
Petrochemical Industry |
Propane/propylene Splitter Plant |
"Turnkey" Contract |
Lit. 4.000.000.000 |
1985-1987 |
| Company: ENICI-IEMIANIC S.p.A Milano |
Petrochemical Industry |
Water circuit, recirculated open, served by a cooling tower with forced draught |
"Turnkey" Contract |
Lit. 500.000.000 |
1985-1987 |
| Company: SARAS CHIMICA S.p.A Milano |
Chemical Industry |
Propane/Propylene splitter Plant |
Base Engineering |
Hours 2.500 |
1984-1985 |
| Company: S.I.S.A.S S.p.A Milano |
Petrochemical Industry |
Maleica anhydride Plant |
Detail Engineering |
Hours 12.000 |
1984-1985 |
| Company: ENICI-IENUANIC S.p.A Milano |
Petrochemical Industry |
Pyrolytic gasoline fractionation Plant |
Feasibility and process study for energetic arrangement improvement |
Hours 2.000 |
1984 |
| Company: PIERREL S.p.A Milano |
Pharmaceutics Industry |
Revampimg Aspartame Plant |
Detail Engineering |
Hours 2.000 |
1984 |
| Company: BADGER S.p.A Milano |
Engineering company |
Revamping Alkybenzol Plant |
Detail Engineering |
Hours 5.000 |
1983-1984 |